| 注册
首页|期刊导航|现代交通技术|长江码头改造桩帽悬吊法施工技术

长江码头改造桩帽悬吊法施工技术

丁彩良 阎仁才

现代交通技术2009,Vol.6Issue(3):102-105,4.
现代交通技术2009,Vol.6Issue(3):102-105,4.

长江码头改造桩帽悬吊法施工技术

Suspension Construction Technology of Yangtze River Wharf Pile-cap Transformation

丁彩良 1阎仁才1

作者信息

  • 1. 江苏省交通工程集团有限公司,江苏镇江212003
  • 折叠

摘要

Abstract

With the background of Yangtze river wharf transformation construction,a new technology and method of suspension construction in high pile wharf pile cap transformation is supported. And in the pile cap's transformation, the bottom elevation of pile cap constructed with new constructed is lower than primitive method, the effect of water level on new method is less than primitive method.

关键词

码头改造/桩帽/悬吊施工

Key words

wharf transformation/pile cap/suspension construction

分类

交通工程

引用本文复制引用

丁彩良,阎仁才..长江码头改造桩帽悬吊法施工技术[J].现代交通技术,2009,6(3):102-105,4.

现代交通技术

1672-9889

访问量0
|
下载量0
段落导航相关论文