The 1 200/125-t bridge crane in the left power house of Three Gorges Project is at present the largest one of its kind at home and abroad in terms of its lifting capacity for a single hook.The crane is used for installation,operating maintenance and repair of 14 large-sized hydrogenerator units with per-unit rated output of 700 MW in the left power house.This paper presents its properties and structural characteristics and application of new technologies.For example,a hinged structure with minimum height is adopted both to uniformly stress wheels of the bridge crane and to reduce the height of the bridge crane;in electric drive,an energy-regenerative(feedback-type) speed regulation scheme with frequency converted on common direct current busbars is adopted,resulting in eliminating braking electric resistances.The new structure and new technologies adopted in the 1 200/125-t bridge crane can be used for reference in design and manufacture of other large and medium-sized bridge cranes in the future.

关键词

左岸电站/桥式起重机/结构特点/新技术应用/三峡水利枢纽

分类

机械制造

引用本文复制引用

周云章,熊腾晖..三峡左岸电站桥机结构及新技术应用[J].人民长江,2001,32(6):1-3,3.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文