Determination of Preventive Maintenance Lead Time Using Hybrid Analysis

SUN Yong MA Lin Joseph Mathew ZHANG Sheng

国际设备工程与管理(英文版)2005,Vol.10Issue(1):13-18,6.
国际设备工程与管理(英文版)2005,Vol.10Issue(1):13-18,6.

Determination of Preventive Maintenance Lead Time Using Hybrid Analysis

Determination of Preventive Maintenance Lead Time Using Hybrid Analysis

SUN Yong 1MA Lin 1Joseph Mathew 1ZHANG Sheng1

作者信息

  • 1. CRC for Integrated Engineering Asset Management, School of Mechanical, Manufacturing and Medical Engineering, Brisbane, Queensland University of Technology 4001, Australia
  • 折叠

摘要

Abstract

The time for conducting Preventive Maintenance (PM) on an asset is often determined using a predefined alarm limit based on trends of a hazard function. In this paper, the authors propose using both hazard and reliability functions to improve the accuracy of the prediction particularly when the failure characteristic of the asset whole life is modelled using different failure distributions for the different stages of the life of the asset. The proposed method is validated using simulations and case studies.

关键词

alarm limit/peventive maintenance/reliability/hazard

Key words

alarm limit/peventive maintenance/reliability/hazard

分类

机械制造

引用本文复制引用

SUN Yong,MA Lin,Joseph Mathew,ZHANG Sheng..Determination of Preventive Maintenance Lead Time Using Hybrid Analysis[J].国际设备工程与管理(英文版),2005,10(1):13-18,6.

国际设备工程与管理(英文版)

1007-4546

访问量0
|
下载量0
段落导航相关论文