岩土工程学报2008,Vol.30Issue(11):1651-1656,6.
面板堆石坝变形监测研究
Discussion on monitoring and deformation aspects of concrete face rockfill dam
Anna Szostak-Chrzanowski 1DENG Nianwu 1LI Min 2Michel Massiéra2
作者信息
- 1. Canadian Centre for Geodetic Engineering, University of New Brunswick, Canada
- 2. State Key Laboratory of Water Resources and Hydropower Ensineering Science, Wuhum University, Wuhan 430072, China
- 折叠
摘要
Abstract
Safety of Concrete Face Rockfill Dams (CFRDs) depends on the proper design, construction, and monitoring of actual behavionr during the construction and the operation of the structure. Geotechnical and geodetic monitoring may provide information on the state of deformation and provide a warning system in case of an abnormal behaviour of the dam. CFRDs undergo deformations during their construction and the reservoir filling. During construction, the rockfill settles and compacts until the end-of-construction stage. During impounding, the rockfill deforms under the water pressure. The upstream concrete face deforms as a result of the rockfill deformation. The displacements of the concrete face during the reservoir filling should not exceed the maximum allowed values in order to maintain the structural integrity of the concrete face. Due to the uncertainty of the model parameters, careful monitoring of the dam and its surroundings is required in order to verify and enhance the model. The paper presents a study of development of deformation ofa CFRD using FEM analysis. The discussion is illustrated using the example of CFRD in P. R. China.关键词
面板堆石坝/位移分析/有限元/安全监测Key words
concrete face rockfill dam/deformation analysis/finite dement method/monitoring分类
建筑与水利引用本文复制引用
Anna Szostak-Chrzanowski,DENG Nianwu,LI Min,Michel Massiéra..面板堆石坝变形监测研究[J].岩土工程学报,2008,30(11):1651-1656,6.