Simulation analysis of construction process of high rock slope's stabilizationOA
Simulation analysis of construction process of high rock slope's stabilization
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope' s stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equ…查看全部>>
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope' s stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and dis-placement vector graphs at different construction steps were obtained, and the behavior of the slope during stabi-lization construction p…查看全部>>
ZHU Zhan-yuan;LING Xian-zhang;WANG Xuan-qing;ZOU Zu-yin
School of Civil Engineering, Harbin Institute of Technology, Harbin 1500090, ChinaInformation and Engineering Technology College, Sichuan Agricultural University, Ya'an 625014, ChinaSchool of Civil Engineering, Harbin Institute of Technology, Harbin 1500090, ChinaZhengyuan Construct Company of Shandong Province, Yantai 264002, China
交通工程
high rock slope stability stabilization construction process simulation elasto-plastic FEMmethod
high rock slope stability stabilization construction process simulation elasto-plastic FEMmethod
《哈尔滨工业大学学报(英文版)》 2008 (2)
188-193,6