水利水电技术2001,Vol.32Issue(4):20-21,2.
万家寨引黄工程总干线一、二级泵站蜗壳基础设计
Foundation Design for Scroll Case of Pamp Station NO.1 and No.in General Line of YRDP
何际平 1段雪莹 2张伟波 2刘莉2
作者信息
- 1. 山西省万家寨引黄工程管理局,
- 2. 水利部天津水利水电勘测设计研究院,
- 折叠
摘要
Abstract
Base on design requirement of electrical and mechanical equipment of pump station No.1 and No.2 in Wanjiazhai Yellow River Diversion Project, the scroll case foundation just is a mass concrete short for frustum of a cone with 45cm wide and 23cm high. Because of stressing on foundation is considerable, section steel fixing foundation is adopted to meet the design requirement.关键词
蜗壳基础/型钢埋件/焊缝/施工技术/基础设计分类
能源科技引用本文复制引用
何际平,段雪莹,张伟波,刘莉..万家寨引黄工程总干线一、二级泵站蜗壳基础设计[J].水利水电技术,2001,32(4):20-21,2.