| 注册
首页|期刊导航|系统工程理论方法应用|基于模糊交货期分布式多工厂单件制造业的生产计划

基于模糊交货期分布式多工厂单件制造业的生产计划

周金宏 汪定伟

系统工程理论方法应用2000,Vol.9Issue(3):229-234,6.
系统工程理论方法应用2000,Vol.9Issue(3):229-234,6.

基于模糊交货期分布式多工厂单件制造业的生产计划

Production Planning with Fuzzy Due Data for Multi-Location OKP Manufacturing Systems

周金宏 1汪定伟1

作者信息

  • 1. 东北大学信息科学与工程学院系统工程系,沈阳 110006
  • 折叠

摘要

Abstract

Production planning with fuzzy due date for multi-location OKP manufacturing systems is studied, two kinds of models with different type of fuzzy due date are proposed to control JIT production. The optimal production planning results can be obtained by the algorithm developed in the article. The results show that it can obtain a satisfactory solution and have potential applied to practical production applications.

关键词

分布式计划/模糊交货期/隶属函数/准时化生产/单件制造业/供应链

Key words

multi-location planning fuzzy due date membership function JIT production OKP supply chain

分类

机械制造

引用本文复制引用

周金宏,汪定伟..基于模糊交货期分布式多工厂单件制造业的生产计划[J].系统工程理论方法应用,2000,9(3):229-234,6.

基金项目

国家自然科学基金(69684005)和863计划CIMS主题(863-511-9844-011)资助课题 (69684005)

系统工程理论方法应用

OACSCDCSTPCD

2097-4558

访问量0
|
下载量0
段落导航相关论文