This paper describes the construction of the floating mooring bollard in the chamber of Three Gorges Permanent Lock. In the concrete slip-form construction of civil project, each installation unit of the mooring bollard, as the embedding part of the first-phase metal structure, is made as a whole in factory. Its guiding rail is permanently linked to the protection corner. The temporary support is added between guiding rails and protection corners. After the setting-out of ground foundation, the bottom gate unit is positioned and then other units are installed up to the top of gate. The bottom gate unit is taken as a base to measure and adjust the verticality of each gate unit. The connection of each unit and the rock body of gate wall is linked by expansion bolt and anchorage bar. Then slip-form construction of civil project is conducted. In the lift of slip-form, the monitoring and control are made to ensure the installation quality of the floating mooring bollard in the chamber of Three Gorges Permanent Lock and to reduce installation consumption materials and shorten construction period. All these measures have been proved in the practice.关键词
金属结构安装/永久船闸/浮式系船柱/三峡工程分类
建筑与水利