龙滩水电站主要机电设备及其布置

张培裘

红水河2001,Vol.20Issue(2):30-32,3.
红水河2001,Vol.20Issue(2):30-32,3.

龙滩水电站主要机电设备及其布置

Essential Mechanico-electrical Equipments and Their Arrangement in LHP

张培裘1

作者信息

  • 1. 国家电力公司中南勘测设计研究院,
  • 折叠

摘要

Abstract

The construction for Longtan porject is divided into two stages. Its water head fluctuation is big. Under the condition of no increase in normal head, normal output and runner diameter of turbine, it is recommended a max. capacity 700 MW without replacement of runner and unit speed. It is also recommended to use separate phase closed generator voltage bus bar; special composite three phase main transformer; dry cable for 500 kV high voltage lead; CIS for 500 kV distribution device.

关键词

机电设计/设备布置/龙滩水电站