龙滩水电站主要机电设备及其布置
Essential Mechanico-electrical Equipments and Their Arrangement in LHP
摘要
Abstract
The construction for Longtan porject is divided into two stages. Its water head fluctuation is big. Under the condition of no increase in normal head, normal output and runner diameter of turbine, it is recommended a max. capacity 700 MW without replacement of runner and unit speed. It is also recommended to use separate phase closed generator voltage bus bar; special composite three phase main transformer; dry cable for 500 kV high voltage lead; CIS for 500 kV distribution device.关键词
机电设计/设备布置/龙滩水电站分类
建筑与水利引用本文复制引用
张培裘..龙滩水电站主要机电设备及其布置[J].红水河,2001,20(2):30-32,3.