水利水电技术2001,Vol.32Issue(1):31-34,4.
我国水利工程建设与管理
Hydro Project Construction and Management in China
摘要
Abstract
Since the People's Republic of China was founded, the hydro project construction has developed rapidly, and the remarkable achievements have been obtained. The hydro project management is being standardized, modernized, and implemented according to the laws progressively. However, there are three main problems in the fields of hydro project construction and management as follows. (1) Many built hydro projects can not meet the requirements of flood control and benefit promotion because of their low standards and poor quality; (2) Ignoring of hydro project management for a long time has led to backward management means and low technical level, and influenced the construction and benefits of hydro projects; (3) The hydro project construction can not meet the requirements of the national economy, social and environment development. In view of above problems, 15 key techniques have been raised, including: (1) Seepage control techniques for dike and dam foundation with deep overburden; (2) Study of mechanism, forecast and treatment measures of dike collapse; (3) Study of ageing and defects of hydro projects; and (4) Monitoring techniques for hydro projects, etc..关键词
水利工程建设/水利工程管理/关键技术/问题/中国分类
建筑与水利引用本文复制引用
王仁钟,章为民,蔡跃波,吴建华..我国水利工程建设与管理[J].水利水电技术,2001,32(1):31-34,4.