| 注册
首页|期刊导航|东华大学学报(英文版)|Modeling and Experiments of Spray System for Cable Painting Robot

Modeling and Experiments of Spray System for Cable Painting Robot

ZHANG Jia-liang Lü Tian-sheng LI Bei-zhi

东华大学学报(英文版)2008,Vol.25Issue(4):355-360,6.
东华大学学报(英文版)2008,Vol.25Issue(4):355-360,6.

Modeling and Experiments of Spray System for Cable Painting Robot

Modeling and Experiments of Spray System for Cable Painting Robot

ZHANG Jia-liang 1Lü Tian-sheng 2LI Bei-zhi1

作者信息

  • 1. College of Mechanical Engineering,Donghua University,Shanghai201620,China
  • 2. College of Mechanical and Power Engineering,Shanghai Jiaotong University,Shanghai200030,China
  • 折叠

摘要

Abstract

Many cable-stayed bridges have been built in the world in the past decades,and cable-stayed structures have been adopted in many large constructions.The cable painting robot is safe and economically efficient for stay cable maintenance.In order to satisfy the need for spraying cables in hiigh attitude,an automatic cable spray system for cable painting robots is presented in this paper.Using the βdistribution,paint thickness distribution on a cylinder surface is modeled.The spray gun's number,angle and movement are analyzed to get coat evenness.Then a robotic spray system engineering prototype has been developed,which includes a cable electric running climbing base,a spray cover,four airless spray guns and a pressurized paint container.Experiments indicate that four airless spray guns can guarantee good coat quality for general stay cables.The field tests have been successfully conducted on Nanpu Bridge,Shanghai.

关键词

robot/stay cable/spray painting/modelling

Key words

robot/stay cable/spray painting/modelling

分类

信息技术与安全科学

引用本文复制引用

ZHANG Jia-liang,Lü Tian-sheng,LI Bei-zhi..Modeling and Experiments of Spray System for Cable Painting Robot[J].东华大学学报(英文版),2008,25(4):355-360,6.

基金项目

Supported by Shanghai Leading Academic Discipline Project(No.B602) (No.B602)

东华大学学报(英文版)

1672-5220

访问量0
|
下载量0
段落导航相关论文