山东煤炭科技Issue(6):36-37,2.
何岗煤矿主井井筒冻结段双层井壁夹缝注浆封水技术措施
The shafe wall frozen double-layers sandwiching mud-grouting water sealing technique measures in Hegang coal mine main shafe
引用本文复制引用
赵启静,张宜法,李方名..何岗煤矿主井井筒冻结段双层井壁夹缝注浆封水技术措施[J].山东煤炭科技,2004,(6):36-37,2.