百色水电站进水塔结构布置和稳定应力分析

农克俭

红水河2001,Vol.20Issue(1):38-41,4.
红水河2001,Vol.20Issue(1):38-41,4.

百色水电站进水塔结构布置和稳定应力分析

Structure Arrangement and Stability-Stress Analysis on Intake Tower of Hydropower Station of Baise Project

农克俭1

作者信息

  • 1. 广西水利电力勘测设计研究院,
  • 折叠

摘要

Abstract

The structure arrangement of the intake tower for the underground hydropower station of Baise project is suit to the complex topography and geology condition, and the hydraulic test shown that the flow pattern entering the tower is well. The static and dynamic 3-D finite element analysis for the intake tower shown that the stability and stress of the stucture satisfy the specification.

关键词

水电站进水塔/结构布置/稳定应力分析/百色水利枢纽

分类

建筑与水利

引用本文复制引用

农克俭..百色水电站进水塔结构布置和稳定应力分析[J].红水河,2001,20(1):38-41,4.