自动化学报2001,Vol.27Issue(3):387-391,5.
支持虚拟企业建立的项目优化调度算法
A PROJECT SCHEDULING ALGORITHM FOR THE FORMATION OF VIRTUAL ENTERPRISES
摘要
Abstract
This paper deals with the multi-mode multiple resource-constrained project scheduling problem (MRCPSP),which is abstracted from modeling the formation process of virtual enterprises of agile manufacturing in the next century. Different from the problem investigated by other researchers,the problem handled in this paper is of variable resource requirement and renewable resource availability constraints.As an extension to the famous DH-procedure,the branch-and-bound algorithm in this paper can solve this kind of most general project scheduling problems with optimality.关键词
多模式/资源受限/项目调度/不可中断/分枝定界分类
信息技术与安全科学引用本文复制引用
毛宁,陈庆新,陈新..支持虚拟企业建立的项目优化调度算法[J].自动化学报,2001,27(3):387-391,5.基金项目
国家"八六三”/CIMS跟踪 ()