广西水利水电Issue(2):40-43,4.
飞来峡水利枢纽主土坝软基坝段裂缝成因分析及处理
Forming cause analysis and dealing of the soft foundation dam section cracks of main dam in the Flying gorge key WR project
陈礼元 1龙三文2
作者信息
- 1. 广东省源大水利水电集团有限公司,
- 2. 广东省飞来峡水利枢纽建设管理局,
- 折叠
摘要
Abstract
The soft foundation dam section has two cracks in the Flying gorge key WR project main dam near Changshuitang because of uneven settlement influence. Taking the processing measures of concrete sequence wall and concretion grouting, the project general work term demand was guaranteed. And the seepage and safety problems were also solved completely.关键词
软基/裂缝/沉降/处理分类
建筑与水利引用本文复制引用
陈礼元,龙三文..飞来峡水利枢纽主土坝软基坝段裂缝成因分析及处理[J].广西水利水电,2001,(2):40-43,4.