矿山压力与顶板管理Issue(2):52-54,3.
综放面沿空巷道围岩控制
Strata controlling of gob-side entry in fully-mechanized mining with top-coal caving face
高路 1吴德儒2
作者信息
- 1. 潞安矿业集团常村煤矿,
- 2. 山西矿业职业技术学院,
- 折叠
摘要
Abstract
Based on field observations, this paper analyzes the strata stability around gob-side entry in fully-mechanized mining with top-coal caving face. The technological key for controlling of strata stability is also indicated. After comparing the differences of several methods for strata controlling, this paper points out that bolting has broad prospect around gob-side entry in fully-mechanized mining with top-coal caving face.关键词
综放面/沿空巷道/围岩控制分类
矿业与冶金引用本文复制引用
高路,吴德儒..综放面沿空巷道围岩控制[J].矿山压力与顶板管理,2001,(2):52-54,3.