水科学进展2001,Vol.12Issue(1):72-80,9.
南水北调中线工程水量优化调度研究
Optimal Water Operation for the Water Transfer Project from South to North(Middle Route)
王银堂 1胡四一 2周全林 2文丹 3王方清 3吴泽宇3
作者信息
- 1. 河海大学水文水资源及环境学院,
- 2. 水利部南京水文水资源研究所,
- 3. 水利部长江水利委员会,
- 折叠
摘要
Abstract
In this paper, the principle and methods of hierarchical analysisfor large-scale system are applied to solve the problems of optimal water operation for the water transfer project from south to north (middle route)and the three-level hierarchical model is established. Having satisfied the total system water supply objects, the optimal regulation diagram of reservoir is determined by simulation technique combined with the optimization methods. It could provide science bases for the project's operation and decision-making in actuality operation condition in the future.关键词
南水北调中线工程/模拟模型/优化调度分类
建筑与水利引用本文复制引用
王银堂,胡四一,周全林,文丹,王方清,吴泽宇..南水北调中线工程水量优化调度研究[J].水科学进展,2001,12(1):72-80,9.