| 注册
首页|期刊导航|地震地磁观测与研究|丹东形变观测洞室改造

丹东形变观测洞室改造

尤权民 姚圣安 迮安民 姚菲菲 陈尚尉 梁永信 隋玉鹏 邓志岩 刘芳彤

地震地磁观测与研究2009,Vol.30Issue(3):74-79,6.
地震地磁观测与研究2009,Vol.30Issue(3):74-79,6.DOI:10.3969/j.issn.1003-3246.2009.03.014

丹东形变观测洞室改造

The reforming of the cave room for deformation measurement on Dandong Seismic Station

尤权民 1姚圣安 1迮安民 1姚菲菲 1陈尚尉 1梁永信 1隋玉鹏 1邓志岩 1刘芳彤1

作者信息

  • 1. 中国辽宁118000 丹东地震台
  • 折叠

摘要

Abstract

For installing horizontal pipe inclinometer and extensometer, the observation condition of cave room for deformation measurement was upgraded during the period of "the Tenth Five-Year Plan". A new pier foundation was constructed. Some difficult problems aroused by the construction of the pier foundation were settled. Favorable condition for the operation of horizontal pipe inclinometer and extensometer was provided. The methods introduced in this paper are referentially useful for constructing pier foundation in other seismic station.

关键词

形变观测/洞室改造/基墩建造/高差测量

Key words

deformation observation, cave room rebuilding, pier foundation construction, height difference survey

分类

天文与地球科学

引用本文复制引用

尤权民,姚圣安,迮安民,姚菲菲,陈尚尉,梁永信,隋玉鹏,邓志岩,刘芳彤..丹东形变观测洞室改造[J].地震地磁观测与研究,2009,30(3):74-79,6.

基金项目

地震行业专项200708006 ()

地震地磁观测与研究

OACSTPCD

1003-3246

访问量0
|
下载量0
段落导航相关论文