For installing horizontal pipe inclinometer and extensometer, the observation condition of cave room for deformation measurement was upgraded during the period of "the Tenth Five-Year Plan". A new pier foundation was constructed. Some difficult problems aroused by the construction of the pier foundation were settled. Favorable condition for the operation of horizontal pipe inclinometer and extensometer was provided. The methods introduced in this paper are referentially useful for constructing pier foundation in other seismic station.关键词
形变观测/洞室改造/基墩建造/高差测量Key words
deformation observation, cave room rebuilding, pier foundation construction, height difference survey分类