| 注册
首页|期刊导航|人民珠江|三峡水利枢纽导流底孔研究

三峡水利枢纽导流底孔研究

唐力

人民珠江Issue(2):7-9,3.
人民珠江Issue(2):7-9,3.

三峡水利枢纽导流底孔研究

Study on the Bottom Diversion Outlets of the Three Gorges Project

唐力1

作者信息

  • 1. 长江水利委员会三峡设代局,
  • 折叠

摘要

Abstract

Construction of the Three Gorges Project is divided into three stages. The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank. The spillway section will be provided with three rows of release outlets of which 22 bottom outlets will be used for construction diversion in the third stage, hence, it is an important structure for ensuring the safety in the construction of of the right bank powerhouse in the third stage and the safety in the operation of the left bank powerhouse.

关键词

导流底孔/设计研究/三峡水利枢纽

分类

建筑与水利

引用本文复制引用

唐力..三峡水利枢纽导流底孔研究[J].人民珠江,2001,(2):7-9,3.

人民珠江

1001-9235

访问量3
|
下载量0
段落导航相关论文