热力发电2009,Vol.38Issue(7):83-87,5.DOI:10.3969/j.issn.1002-3364.2009.07.083
300 MW循环流化床空冷机组协调控制及其优化
COLLABORATIVE CONTROL AND OPTIMIZATION OF 300 MW AIR-COOLED CIRCULATING FLUIDIZED BED UNIT
赵志丹 1郝德锋 1黄晓华 2党黎军 1陈志刚 1王亚军3
作者信息
- 1. 西安热工研究院有限公司,陕西西安710032
- 2. 中国电力出版社,北京,100044
- 3. 陕西华电蒲城发电有限公司,陕西,蒲盛,715501
- 折叠
摘要
Abstract
This paper introduces the collaborative control strategy on a home-made 300 MW air-cooled circulating fluidized bed unit in North United Power Corporation Mengxi Power Plant of China Huaneng Group. To solve the thermal inertia problem,the wind/fuel amount change feedforward ac-cording to load variation and the proportional control of fuel amount feedforward according to coal quality are optimized. Operation results illuminate that the load variation of the unit can reaches to 2 and 4 MW/min,and stable and rapid control of the unit is achieved.关键词
300 MW机组/循环流化床/空冷/协调控制/前馈/蒙西发电厂Key words
300 MW unit/circulating fluidized bed/air-cooled/collaborative control/feedforward分类
能源科技引用本文复制引用
赵志丹,郝德锋,黄晓华,党黎军,陈志刚,王亚军..300 MW循环流化床空冷机组协调控制及其优化[J].热力发电,2009,38(7):83-87,5.