A runback test of unit is conducted in Shanwei power plant, and the test result is analyzed. Focusing on the faults in the test, such as fan vibration due to coal grinder trip, rapid open of main steam valve due to high pressure slipping rate of the set value of main steam pressure,and fast rise of water level in No. 3 high-pressure heater,modifications of the fan control logic and the pressure slip-ping rate of the set value of main steam pressure are performed, and the urgent drain valve is pre-opened to a certain extent. Satisfactory control result is achieved via these measures.

关键词

汕尾发电厂/超临界/600 MW机组/DCS/RB试验/协调控制

Key words

Shanwei power plant i supercritical/600 MW unit/distributed control system i runback test/collaborative control

分类

能源科技

引用本文复制引用

刘海波,李海龙..汕尾发电厂RB功能试验分析[J].热力发电,2009,38(7):96-99,4.

热力发电

OA北大核心

1002-3364

访问量3
|
下载量0
段落导航相关论文