建筑结构学报2010,Vol.31Issue(5):181-187,7.
上海世博500kV地下变电站圆形深基坑逆作法变形与受力特性实测分析
Analysis of monitored displacement and stress of deep cylindrical structure for the 500kV World Expo Underground Transmission and Substation project during excavation by top-down method
摘要
关键词
圆形深基坑/逆作法/圆形地下连续墙/现场监测/变形/受力特性Key words
cylindrical excavation/top-down method/cylindrical retaining wall/site monitor/settlement/bearing behavior分类
建筑与水利引用本文复制引用
宋青君,王卫东..上海世博500kV地下变电站圆形深基坑逆作法变形与受力特性实测分析[J].建筑结构学报,2010,31(5):181-187,7.基金项目