金安桥水电站水土保持防治分区及实施措施
Zoning and Measures on Soil and Water Conservation for Jin'anqiao Hydropower Station
雷俊杰 1乔婧 2谢珍2
作者信息
- 1. 金安桥水电站有限公司,云南,丽江,674100
- 2. 长江三峡经济技术发展有限公司金安桥水电站监理部,云南,丽江,674100
- 折叠
摘要
Abstract
Based on the control area of soil and water loss in Jin'anqiao Hydropower Station Project, the subzones and corresponding measures for soil erosion control were put forward. The study shows that the construction area of Project is the key area of soil erosion, and the erosion can be effectively controlled by taking engineering measures as primary and planting measures as supplementary.关键词
水土保持/防治分区/措施/金安桥水电站分类
农业科技引用本文复制引用
雷俊杰,乔婧,谢珍..金安桥水电站水土保持防治分区及实施措施[J].水力发电,2011,37(1):16-19,4.