| 注册
首页|期刊导航|水科学与水工程|Risk analysis for earth dam overtopping

Risk analysis for earth dam overtopping

Mo Chongxun Liu Fanggui Yu Mei Ma Rongyong Sun Guikai

水科学与水工程2008,Vol.1Issue(2):76-87,12.
水科学与水工程2008,Vol.1Issue(2):76-87,12.DOI:10.3882/j.issn.1674-2370.2008.02.008

Risk analysis for earth dam overtopping

Risk analysis for earth dam overtopping

Mo Chongxun 1Liu Fanggui 1Yu Mei 2Ma Rongyong 1Sun Guikai1

作者信息

  • 1. College of Civil and Architectural Engineering, Guangxi University, Nanning 530004, P. R. China
  • 2. Institute of Soil Science, Chinese Academy of Sciences, Nanjing 210008, P. R. China
  • 折叠

摘要

Abstract

In this paper, a model of overtopping risk under the joint effects of floods and wind waves, which is based on risk analysis theory and takes into account the uncertainties of floods, wind waves, reservoir capacity and discharge capacity of the spillway, is proposed and applied to the Chengbihe Reservoir in Baise City in Guangxi Zhuang Autonomous Region. The simulated results indicate that the flood control limiting level can be raised by 0.40 m under the condition that the reservoir overtopping risk is controlled within a mean variance of 5×10-6. As a result, the reservoir storage will increase to 16 million m3 and electrical energy generation and other functions of the reservoir will also increase greatly.

关键词

overtopping risk analysis/earth dam/flood/wind wave/risk standard

Key words

overtopping risk analysis/earth dam/flood/wind wave/risk standard

引用本文复制引用

Mo Chongxun,Liu Fanggui,Yu Mei,Ma Rongyong,Sun Guikai..Risk analysis for earth dam overtopping[J].水科学与水工程,2008,1(2):76-87,12.

基金项目

This work was supported by the National Natural Science Foundation of China (Grant No. 50609005), the Science Foundation of Guangxi Education Department (Grant No. 200708LX099) and the Science Foundation of Guangxi University (Grant No. X071096). (Grant No. 50609005)

水科学与水工程

1674-2370

访问量0
|
下载量0
段落导航相关论文