水科学与水工程2008,Vol.1Issue(4):107-113,7.DOI:10.3882/j.issn.1674-2370.2008.04.012
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period
摘要
Abstract
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up.关键词
South-to-North Water Diversion Project/reliability model/management chain/parallel connection/series connectionKey words
South-to-North Water Diversion Project/reliability model/management chain/parallel connection/series connection引用本文复制引用
Feng Jingchun,Zhou Yang,Hong Yuzhen,Zhao Shixin,Ren Xiaoqiang..Reliability model of organization management chain of South-to-North Water Diversion Project during construction period[J].水科学与水工程,2008,1(4):107-113,7.基金项目
This work was supported by the National Science and Technology Plan (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A 13). (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A 13)