航天器工程2008,Vol.17Issue(6):54-58,5.
资源一号02B卫星分系统间抗电磁干扰的措施
CBERS-02B Anti-interference EMC Measures between Subsystems
摘要
Abstract
The article describes that data collection subsystem uplink is interfered during CBERS-2B satellite electromagnetic compatibility test. A series of electromagnetic compatibility measures are carried out.It proved that two star sensors conduct emission and HR camera & WFI camera data transmission radiation emission are weakened during AIT test in all normal working modes (real time imaging and playback mode), so that the data collection subsystem uplink interference is reduced from 15dB to 4dB, and data collection subsystem interference is controlled well. The test proved electromagnetic compatibility measures are available and reasonable. By carrying out these measures, data collection subsystem, attitude and orbit control subsystem as well as HR camera & WFI camera data transmit subsystems are of electromagnetic compatibility.关键词
资源一号02B卫星/DCS上行链路/干扰/EMC措施验证Key words
CBERS-02B/DCS uplink/interference/EMC measures verification分类
航空航天引用本文复制引用
汪静,贾旭..资源一号02B卫星分系统间抗电磁干扰的措施[J].航天器工程,2008,17(6):54-58,5.基金项目
国家重大科技专项工程 ()