摘要
Abstract
The paper introduced the fast triumphant demolition of five hyperbolic cooling towers by directional blasting under the pressing time of construction. With elaborate design and construction, the successful experience which contains the complete twisting fragmentation, and the downright collapse,and the favorable blasting harm control, and the successful demolition of three 70 m constructional hyperbolic cooling towers in particular by directional blasting can be achieved. The paper provides a reference to the similar project.关键词
爆破拆除/冷却塔/爆破切口/切口参数Key words
blasting demolition/ cooling tower/ blasting cut/ cut parameters分类