水资源保护2011,Vol.27Issue(1):73-75,3.DOI:10.3969/j.issn.1004-6933.2011.01.017
基于人工湿地的组合处理系统净化校园人工湖设计
Design of assembling treatment system to purify campus artificial lake based on constructed wetland
吴菊珍 1成和平 1周筝1
作者信息
- 1. 成都电子机械高等专科学校,四川,成都,610031
- 折叠
摘要
Abstract
The present status of artificial lake in a university of Chengdu was investigated, and the water treatment methods of artificial lake and scenic water from China and elsewhere were compared.Combining specific circumstance of the campus artificial lake, a so-called “power cycling + sand leach + waterfall oxygenating + constructed wetland + lake itself” ecological treatment assembling system was put forward for treating the water in the campus artificial lake.And the chlorine dioxide generator was installed to remove algae in algae bloom time.This process program had good result.关键词
人工湖/水处理/砂滤/跌水充氧/人工湿地分类
资源环境引用本文复制引用
吴菊珍,成和平,周筝..基于人工湿地的组合处理系统净化校园人工湖设计[J].水资源保护,2011,27(1):73-75,3.