工程地质学报2011,Vol.19Issue(1):103-108,6.
隧道下穿既有结构物引起的地表沉降控制标准研究
CONTROL STANDARDS FOR SETTLEMENT OF GROUND SURFACE WITH EXISTING STRUCTURES DUE TO UNDERGROUND CONSTRUCTION OF CROSSING TUNNELS
陈星欣 1白冰1
作者信息
- 1. 北京交通大学,土木建筑工程学院,北京,100044
- 折叠
摘要
Abstract
Ground settlements due to construction of underground tunnels crossing existing structures are an important issue. It is often encountered in the development of underground traffic and high speed railways lines. This paper investigates the ground settlement standards and methods caused by tunnel excavation. According to the different characteristics of roads, railways, tunnels and buildings, and including different construction characteristics, excavation areas, depths and engineering geological conditions, different existing structures have different control measures and recommended standards. So, the current standards of ground settlements are unreasonable in tunnels crossing, because the characteristics of the existing structure, geological conditions and construction features may not be taken into account in the ground settlement standards.关键词
隧道/地表沉降/下穿/沉降控制标准/沉降控制措施Key words
Tunnel/ Ground settlement/ Crossing/ Settlement standard/ Control measure分类
交通工程引用本文复制引用
陈星欣,白冰..隧道下穿既有结构物引起的地表沉降控制标准研究[J].工程地质学报,2011,19(1):103-108,6.