Abstract

Due to the high work in process (WIP) level for production processes of plastic products, lot sizing problem is discussed in this paper. By analyzing the production processes, a simulation model is built based on the eM-Plant platform. By simulation with this model, it shows that the WIP can be significantly reduced and meanwhile productivity can be increased ff an appropriate lot size at different stage of the production process is chosen. Moreover, guideline is presented for how lot size can be determined.

关键词

批量/在制品/仿真程序

Key words

lot sizing/ work-In-process/ simulation

分类

机械制造

引用本文复制引用

霍建恩,彭重嘉..基于eM-Plant对注塑企业的生产线建模仿真[J].工业工程,2011,14(1):118-122,5.

工业工程

OA北大核心CHSSCDCSTPCD

1007-7375

访问量0
|
下载量0
段落导航相关论文