| 注册
首页|期刊导航|结构工程师|混凝土结构施工过程的数值模拟分析

混凝土结构施工过程的数值模拟分析

徐蓉 贺明华

结构工程师2011,Vol.27Issue(1):144-148,5.
结构工程师2011,Vol.27Issue(1):144-148,5.

混凝土结构施工过程的数值模拟分析

Numerical Analysis for Construction Process of RC Structures

徐蓉 1贺明华1

作者信息

  • 1. 同济大学土木工程学院建筑工程系,上海200092
  • 折叠

摘要

Abstract

This paper modeled the overall process of construction of a simple three-level concrete structure with numerical analysis software. Comparison between the results of simulation and experiment verified the reliability of numerical analysis. The research shows that experimental value and modeled value varied with the same variation trend and the absolute values of them are closed. However, the modeled value is less than experimental value. Besides it, construction load keeps redistributing during construction. With the increasing of concrete strength, loads shared by floors are increasing, while those shared by shores are decreasing.

关键词

数值模拟/混凝土结构施工/阶段施工/模板支撑/荷载传递

Key words

numerical modeling/ concrete structure construction/ stage construction/ forming and shoring/load transmission

引用本文复制引用

徐蓉,贺明华..混凝土结构施工过程的数值模拟分析[J].结构工程师,2011,27(1):144-148,5.