路基工程Issue(1):70-73,4.
斜拉桥主梁横截面拓扑优化研究
Study on Topological Optimization of Beam Cross Section of Cable Stayed Bridge
曹云 1胡秋香2
作者信息
- 1. 南京工程学院建筑工程学院,南京,211167
- 2. 山东电力工程咨询院有限公司,济南,250013
- 折叠
摘要
Abstract
For complicated stress condition of the main beam of cable stayed bridge, the initial structure dimension is commonly determined according to experience in design and the relatively optimum structure that satisfies the requirement is obtained through several calculations. In this paper, combined with Junshan Yangtze River cable stayed bridge project, through analyzing singular problems of traditional evolutionary structural topological optimization, the bi-directional evolutionary structural optimization that can ensure convergence is advanced. Thus the topological optimization of beam cross section of cable stayed bridge is studied.关键词
斜拉桥/主梁/拓扑优化Key words
cable stayed bridge/ main beam/ topological optimization分类
交通工程引用本文复制引用
曹云,胡秋香..斜拉桥主梁横截面拓扑优化研究[J].路基工程,2011,(1):70-73,4.