800 kV特高压换流变压器现场局部放电试验

谢超 孙勇

中国电力2011,Vol.44Issue(1):19-21,3.
中国电力2011,Vol.44Issue(1):19-21,3.

800 kV特高压换流变压器现场局部放电试验

Field partial-discharge test for 800 kV UHVDC converter transformer

谢超 1孙勇1

作者信息

  • 1. 中国南方电网超高压输电公司广州局,广东,广州,510663
  • 折叠

摘要

Abstract

The partial discharge (PD)test is one of the effective methods to detect fault in transformer.The field PD test for 800 kV U HV converter transformer conducted in Yunnan-Guangdong ± 800 kV UHVDC project is the first PD test for UHV substation converter transformer on the world's highest voltage level.The standards, procedures and process of the PD test are presented.The problems that appear in PD tests are analyzed, including under-compensated inductive current, over-heating electric cable, interference effect caused by the operation of low-voltage converter transformers and thyristor valves.The solutions are validated in the test process.The advantages and disadvantages of field PD test to ensure the installation quality and operation safety of converter transformer are also analyzed.

关键词

800 kV特高压直流输电/换流变压器/局部放电试验

分类

信息技术与安全科学

引用本文复制引用

谢超,孙勇..800 kV特高压换流变压器现场局部放电试验[J].中国电力,2011,44(1):19-21,3.

中国电力

OA北大核心CSCDCSTPCD

1004-9649

访问量0
|
下载量0
段落导航相关论文