结构低周反复加载试验方法浅谈

卢文胜 李斌 曹文清 曹海

结构工程师2011,Vol.27Issue(z1):15-21,7.
结构工程师2011,Vol.27Issue(z1):15-21,7.

结构低周反复加载试验方法浅谈

Discussion on Testing Methods of Reversed Cyclic Quasi-static Loading Test

卢文胜 1李斌 1曹文清 1曹海1

作者信息

  • 1. 同济大学结构工程与防灾研究所,上海200092
  • 折叠

摘要

Abstract

In this paper, firstly, a brief introduction of the composition of the testing system is made.Then some problems occurring during the process of operation and testing are introduced and some solutions are put forward for reference.Problems existing in reaction frame of beam-to-column joint test, such as problems of installation gap and vertical force loading system, are emphasized in this paper.And a set of new reaction frame system are designed to solve them.

关键词

低周反复加载试验/试验设备/反力架/梁柱节点

Key words

reversed cyclic quasi-static loading test/ testing equipments/ reaction frame/ beam-to-column joint

引用本文复制引用

卢文胜,李斌,曹文清,曹海..结构低周反复加载试验方法浅谈[J].结构工程师,2011,27(z1):15-21,7.

结构工程师

OA北大核心CSTPCD

1005-0159

访问量0
|
下载量0
段落导航相关论文