控制理论与应用2011,Vol.28Issue(4):519-524,6.
啤酒生产调度数学模型及其优化
Mathematical programming model for beer production scheduling and its optimization
摘要
Abstract
To deal with the deficiency of manual scheduling, we propose a mathematical model for beer production scheduling, and present the method for its optimization.Based on the production process, the entire beer production is divided into saccharification area, and filtering and packing area.For the production in each area, we set up the corresponding mathematical progranuning model for production scheduling, which is then optimized by using the ant colony optimization algorithm.The application results show that the developed optimization program provides robust operation in practical productions.It is also convenient and effective in production management.关键词
生产调度/数学模型/优化/蚁群系统Key words
production scheduling/ mathematical model/ optimization/ ant colony system分类
信息技术与安全科学引用本文复制引用
郑松,葛铭,李春富,薛安克..啤酒生产调度数学模型及其优化[J].控制理论与应用,2011,28(4):519-524,6.基金项目
国家"863"计划资助项目(2007AA04Z166) (2007AA04Z166)
浙江省教育厅科研基金资助项目(Y200804852). (Y200804852)