| 注册
首页|期刊导航|流体机械|辐射吊顶与置换通风复合系统夏季运行策略的探讨

辐射吊顶与置换通风复合系统夏季运行策略的探讨

刘畅 张旭 唐凯

流体机械2011,Vol.39Issue(5):74-77,4.
流体机械2011,Vol.39Issue(5):74-77,4.DOI:10.3969/j.issn.1005-0329.2011.05.017

辐射吊顶与置换通风复合系统夏季运行策略的探讨

Discussion on Operation Strategy of a Combined Radiant Ceiling and Displacement Ventilation System in Summer

刘畅 1张旭 1唐凯1

作者信息

  • 1. 同济大学,上海,200091
  • 折叠

摘要

Abstract

For the operation of combined radiant ceiling and displacement ventilation system in summer, the condensation on the surface of radiant ceiling and the slow response of temperature caused by the system' s big inertia are two key negative factors. Aiming at the two negative factors,the best operation strategy was searched after in this paper,and the field experiments was done in a villa project in shanghai. By analysis on the measured data,the feasibility of operation strategy was discussed. The results show that the strategy can avoid condensation on the surface of radiant ceiling effectively,and the temperature decreasing rate is closely related the parameters of the supply air. In addition, the switching node of stages should be judged according to practical situation.In conclusion, the strategy may be guidance of applying the combined radiant ceiling and displacement ventilation system.

关键词

辐射吊顶/置换通风/运行策略/结露/大惯性

Key words

radiant ceiling/ displacement ventilation/ operation strategy/ condensation/ big inertia

分类

通用工业技术

引用本文复制引用

刘畅,张旭,唐凯..辐射吊顶与置换通风复合系统夏季运行策略的探讨[J].流体机械,2011,39(5):74-77,4.

基金项目

"十一五"国家科技支撑项目:长江流域住宅建筑热湿控制技术研究与示范(2006BAJ01A05) (2006BAJ01A05)

流体机械

OA北大核心CSCDCSTPCD

1005-0329

访问量0
|
下载量0
段落导航相关论文