石油钻采工艺2011,Vol.33Issue(2):35-37,3.
大斜度长隔层套管射孔井砾石充填完井设计与应用
Design and application of multi-zone gravel-pack completion for high deviation and extra-long intervals
郭美华 1廖前华 2巩永刚 1胡陈3
作者信息
- 1. 中海能源发展监督监理技术公司,天津,300452
- 2. 中海石油有限公司天津分公司,天津,300452
- 3. 中海油能源发展采油技术服务公司,天津,300452
- 折叠
摘要
Abstract
High requirements of completion method and string design were proposed for high deviation and long perforation interval gravel packed well. Based on the comparison among all kinds of completion method, proper completion equipments and technology were chosen to optimize the gravel-pack completion design and operation procedure, to reduce the operation risk, and to ensure gravel packing successful. The limitation of one-trip multi-zone gravel-pack completion and the risk of operation were fully considered in a long perforation interval with high deviation in Bohai Oilfield. One-trip gravel pack completion with external casing packer was applied in this well, which satisfied the high requirements of multi-zone gravel packing and the efficiency of interval isolation. This well was successful and reduced the time for stack gravel-packing, which supply a good reference for other gravel pack completion under similar condition.关键词
大斜度/长隔层/套管井/管外封隔器/砾石充填完井Key words
high deviation/ extra-long intervals/ casing perforated well/ external casing packer/ multi-zone gravel pack分类
能源科技引用本文复制引用
郭美华,廖前华,巩永刚,胡陈..大斜度长隔层套管射孔井砾石充填完井设计与应用[J].石油钻采工艺,2011,33(2):35-37,3.