泥沙研究Issue(2):21-26,6.
平滩流量滞后响应模型的改进
Modification of delayed response model for bankfull discharges
摘要
Abstract
Considering the shortcomings in the delayed response model for bankfull discharges, the modified model is developed in two aspects: 1 ) Improving the model's framework, which includes adjusting the effective weight of previous year's water and sediment conditions and deducing the model equation in which β is variational in different years. 2 ) Modifying the model's parameters Qe and β by considering the influence of peak discharge on Qe and the influence of incoming water discharge in the flood season onβ. The applicability of the modified model is tested based on the observed data at Huayuankou, Gaocun, Sunkou, Aishan and Lijin stations on the Lower Yellow River. The result indicates that the modified model has a higher accuracy compared with the original one.关键词
黄河下游/平滩流量/滞后响应/来水来沙/河床演变Key words
Lower Yellow River/ bankfull discharge/ delayed response/ incoming water and sediment/ fluvial processes分类
建筑与水利引用本文复制引用
李凌云,吴保生..平滩流量滞后响应模型的改进[J].泥沙研究,2011,(2):21-26,6.基金项目
中荷战略科学联盟计划项目(2008DFB90240)和水沙科学与水利水电工程国家重点实验室自主研究课题(2008-ZY-3) (2008DFB90240)