电力系统保护与控制2011,Vol.39Issue(9):137-139,144,4.
向上±800kV特高压直流输电工程的直流保护闭锁策略
The DC protection block strategy in Xiangjiaba-Shanghai ±800 kV UHVDC transmission project
霍鹏飞 1王国功 2刘敏 1张培珍 1邹卓霖1
作者信息
- 1. 许继电气直流输电系统部,河南许昌461000
- 2. 宁夏固原供电局,宁夏固原756000
- 折叠
摘要
Abstract
This paper comprehensively introduces and summarizes the converter valve block strategy of the DC protection based on Xiangjiaba-Shanghai ±800 kV UHVDC project. In order to obtain more smooth and fast or more secure stop effect when relevant fault has been detected, the converter need to be removed and isolated as soon as possible to prevent the further breakdown and reduce the impact on the device and power grid. in this project, the different fault conditions are tested and simulated on site, the primary device is effectively protected through phase-shift, temporary stop, block, etc. According to the different combinations and delay of these fault clearing actions, the DC protection block are divided into four categories.关键词
特高压直流输电/换流阀/保护闭锁/触发脉冲/旁通对Key words
ultra HVDC transmission/ converter valve/ protection block/ firing pulse/ by-pass pair分类
信息技术与安全科学引用本文复制引用
霍鹏飞,王国功,刘敏,张培珍,邹卓霖..向上±800kV特高压直流输电工程的直流保护闭锁策略[J].电力系统保护与控制,2011,39(9):137-139,144,4.