Abstract
Titanium pigment industries consume a large amount of fresh water with enormous potential of water-saving. Combined with the investigation of present water system of a titanium pigment plant,direct waste water direct reuse system and regeneration cycling water system were designed by mathematical programming. The results showed that freshwater consumption could be saved by 40.0% respectively in direct waste water direct reuse system and regeneration cycling water system, and waste water direct reuse is a better way for water-saving of titanium pigment industry.关键词
钛白粉行业/水系统优化/数学规划法Key words
titanium pigment industry/ water system optimization/ mathematical programming分类
化学化工引用本文复制引用
米小娟,徐竟成,黄菊文,梁永利,阮星,李光明..水系统优化在某钛白粉厂的应用——数学规划法[J].化工进展,2011,30(6):1384-1387,1390,5.基金项目
中日国际科技合作项目(2009DFA92140)及上海市国际科技合作项目(09160708000). (2009DFA92140)