铁道科学与工程学报2011,Vol.8Issue(1):107-112,6.
预应力钢筋混凝土T梁上拱度计算
A calculation method of prestressed concrete T -beam camber
摘要
Abstract
Considering influences of prestress, concrete creep and shrinkages on prestressed concrete T - beam camber, a theoretical calculation method with high -precise was proposed in the paper. Compared with experimental data, the calculation method satisfied the engineering accuracy request, the results will provide reference for the designs and constructions of pre - camber of prestressed concrete beams.关键词
预应力混凝土T梁/上拱度/计算方法/徐变Key words
restressed benefit concrete T- beams/ camber/ calculation method/ creep分类
建筑与水利引用本文复制引用
龚先兵,向秋燕,宁向向..预应力钢筋混凝土T梁上拱度计算[J].铁道科学与工程学报,2011,8(1):107-112,6.基金项目
湖南交通科技创新项目(200745) (200745)