采矿与安全工程学报2011,Vol.28Issue(1):122-126,5.
康家湾矿含水层下采场导水裂隙带发育高度预测
Prediction of the Height of the Transmissive Fractured Belt of A Mining Stope Under Aquifer in Kangjiawan Mine
摘要
Abstract
The Ⅲ-1 ore body in Kangjiawan mine lies beneath an aquifer. In order to mine the ore body safety, this paper firstly used RFPA2D for simulating the heights of the transmissive fractured belts of mining stopes with different structural parameters. Then, the simulating results were used for establishing the ANFIS (Adaptive Neuro-Fuzzy Inference System) model for predicting the height of the transmissive fractured belt of a mining stope. Finally, the ANFIS model was used for predicting the height of the transmissive fractured belt of 14# mining stope for Ⅲ-1 ore body and the practical height was measured. The results show that, with the mechanical parameters fixed, room span, interval pillar span and stope height are the key parameters influencing the height of the transmissive fractured belt of a mining stope, that the accuracies of the fitting and predicting results by the established ANFIS model amount to 95 % and 98%, respectively, and that the predicted height of the transmissive fractured belt of 14# mining stope for Ⅲ-1 ore body by the established ANFIS model and the measured height are in good agreement.关键词
含水层下采矿/导水裂隙带发育高度/RFPA2D/自适应神经模糊推理系统模型Key words
mining under aquifer/ the height of the transmissive fractured belt / RFPA2D / ANFIS model分类
矿业与冶金引用本文复制引用
贺桂成,肖富国,张志军,丁德馨..康家湾矿含水层下采场导水裂隙带发育高度预测[J].采矿与安全工程学报,2011,28(1):122-126,5.基金项目
国家自然科学基金项目(10975071) (10975071)
高等学校博士学科点专项科研项目(20060540001) (20060540001)
湖南省科技厅项目(2009SK3137) (2009SK3137)
湖南省安全生产科技发展计划项目(07-18) (07-18)