| 注册
首页|期刊导航|中国电力|大容量核电机组接入川渝电网适应性及参与系统调峰研究

大容量核电机组接入川渝电网适应性及参与系统调峰研究

陈汉雄 郑勇

中国电力2011,Vol.44Issue(3):1-5,5.
中国电力2011,Vol.44Issue(3):1-5,5.

大容量核电机组接入川渝电网适应性及参与系统调峰研究

Adaptability of large-capacity nuclear power plants accessing Sichuan and Chongqing grids and ability of participating in system peak-load regulation

陈汉雄 1郑勇1

作者信息

  • 1. 西南电力设计院,四川,成都,610021
  • 折叠

摘要

Abstract

The grid adaptability after access of large capacity nuclear power plants in Sichuan-Chongqing grid is analyzed.The study focuses on problems in terms of load flow distribution,delivery line model selection,grid stability level, short circuit level and the ability to participate in system peak load regulation.The study results show that the reasonable accessing plan for large capacity nuclear power plant can satisfy the need for nuclear power delivery and control the system short circuit level.The large capacity nuclear power plant also has the ability to participate in system peak load regulation when needed,which reduces the quantity of abandoning energy in high flow period.It can also help Sichuan-Chongqing grid to improve comprehensive benefits on economic,social and environment aspects.

关键词

电力系统/核电机组/电网适应性/调峰运行

分类

信息技术与安全科学

引用本文复制引用

陈汉雄,郑勇..大容量核电机组接入川渝电网适应性及参与系统调峰研究[J].中国电力,2011,44(3):1-5,5.

中国电力

OA北大核心CSCDCSTPCD

1004-9649

访问量0
|
下载量0
段落导航相关论文