| 注册
首页|期刊导航|中国电力|电厂锅炉制粉系统优化调整试验

电厂锅炉制粉系统优化调整试验

王运民 周永强 明勇

中国电力2011,Vol.44Issue(3):34-38,5.
中国电力2011,Vol.44Issue(3):34-38,5.

电厂锅炉制粉系统优化调整试验

Optimized adjustment experiments of pulverizing system in power plant

王运民 1周永强 2明勇1

作者信息

  • 1. 长沙理工大学能源与动力工程学院,湖南,长沙,410076
  • 2. 湛江电力有限公司,广东,湛江,524099
  • 折叠

摘要

Abstract

In view of low output and coarse coal problems of the pulverizing system for No.3 boiler in Zhanjiang Power Co.,Ltd.,the optimized adjustment expriments were made. The measuring parameters and calculation method were given. The contents and process of the optimized adjustment experiments were explained. The experiment results were analyzed, and some countermeasures were taken. Finally, the optima operation scheme was confirmed.It is proven that research achievements have high adaptability to the change of coal types, can assure boilermixed coal combustion under safe operation condition, reduce the cost of power generation greatly, and improve the operation economic effect of the boiler.

关键词

锅炉/制粉系统/优化/试验/煤粉细度/钢球装载量

分类

能源科技

引用本文复制引用

王运民,周永强,明勇..电厂锅炉制粉系统优化调整试验[J].中国电力,2011,44(3):34-38,5.

基金项目

国家重点基础研究发展计划(973计划)资助项目(2009CB219803) (973计划)

中国电力

OA北大核心CSCDCSTPCD

1004-9649

访问量0
|
下载量0
段落导航相关论文