南水北调中线工程运行风险分析

杜霞 耿雷华

水利水电技术2011,Vol.42Issue(3):85-88,4.
水利水电技术2011,Vol.42Issue(3):85-88,4.

南水北调中线工程运行风险分析

Risk analysis on operation of Mid-route of South-to-North Water Transfer Project

杜霞 1耿雷华2

作者信息

  • 1. 中国水利水电科学研究院水环境研究所,北京,100038
  • 2. 南京水利科学研究院水文水资源与水利工程科学国家重点实验室,江苏南京,210029
  • 折叠

摘要

Abstract

The Mid-route of the South-to-North Water Transfer Project is divided into four subsystems; i.e. crossing constructions, water conveyance channels, the Yellow River and Zhanghe River Crossing works and control projects, and then the risk factor identification system and the assessment structure model are established for the operations of all the subsystems with the relevant risk analysis methods based on various characteristics and failure mechanisms of their operations. Through the qualitative and quantitative calculations on the operation of the Mid-route Project, the risk grade classification for all the subsystems is realized. Furthermore, not only the relevant control methods and countermeasures for lowering the related risks are given on the basis of the risk analysis results, but some beneficial references are also provided for the safe operation and management of the project concerned.

关键词

南水北调中线工程/工程运行/风险分析

分类

建筑与水利

引用本文复制引用

杜霞,耿雷华..南水北调中线工程运行风险分析[J].水利水电技术,2011,42(3):85-88,4.