The diversion tunnel of Luding Hydropower Station is one of underg round caverns under construction currently in China with extra-large excavation section and most complex geological conditions. The rock slide happens in the location of KO +401.5 m in the excavation of No. 2 diversion tunnel due to the steep dip and large fault in the location of arch crown.The treatment to the rock slide area and the reinforcement to the slide-affected zones are introduced herein.

关键词

特大断面/变形加固/塌方处理/引水洞/泸定水电站

分类

建筑与水利

引用本文复制引用

赵龙飞,范萍,李越..泸定水电站特大断面引水洞变形加固及塌方处理[J].水力发电,2011,(5):48-50,53,4.