| 注册
首页|期刊导航|水力发电|泸定水电站3号泄洪洞出洞开挖支护

泸定水电站3号泄洪洞出洞开挖支护

李越 范萍 赵龙飞

水力发电Issue(5):51-53,3.
水力发电Issue(5):51-53,3.

泸定水电站3号泄洪洞出洞开挖支护

Excavation and Support for the Outlet of No.3 Spillway Tunnel in Luding Hydropower Station

李越 1范萍 1赵龙飞1

作者信息

  • 1. 中国葛洲坝集团三峡分公司泸定水电站施工项目部,四川,泸定,626100
  • 折叠

摘要

Abstract

The rock mass in the outlet section of No. 3 spillway tunnel in Luding Hydropower Station are fractured and weathered and the class of surrounding rock is poor IV in general and V class in some areas. The stability of the surrounding rock is poor. Caused by the left slope landslide, the unbalanced pressure from the two sides of the tunnel is also the key to ensure the safe excavation. The measures adopted in preparation, excavation and support are introduced in detail. The measures guarantee the safe excavation of the outlet section.

关键词

开挖/支护/施工技术/泄洪洞/泸定水电站

分类

建筑与水利

引用本文复制引用

李越,范萍,赵龙飞..泸定水电站3号泄洪洞出洞开挖支护[J].水力发电,2011,(5):51-53,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文