水力发电Issue(5):54-56,66,4.
特大型洞室过浅埋段的开挖与支护
Excavation and Support of the Shallow-buried Section of Extra-large Tunnel
彭伟平 1李海清 2尹伟 2张洋3
作者信息
- 1. 中铁五局(集团)第五工程有限公司,湖南,郴州,423000
- 2. 中国水利水电建设工程咨询中南公司泸定监理中心,四川,泸定,626100
- 3. 四川华电泸定水电有限公司,四川,泸定,626100
- 折叠
摘要
Abstract
The No. 2 spillway tunnel in Luding Hydropower Station is a tunnel with extra-large section. The excavation section is large and wide, and the geological condition is complex. The section of the tunnel passing through the Hunshui Ditch is especially shallow-buried with a smallest rock embedded depth of 6m. Based on the geological information and field survey, the surface and tunnel treatments are combined to deal with the problem. The treatments ensure the successful excavation and support, on schedule.关键词
特大型洞室/过浅埋深/开挖/支护/泸定水电站分类
建筑与水利引用本文复制引用
彭伟平,李海清,尹伟,张洋..特大型洞室过浅埋段的开挖与支护[J].水力发电,2011,(5):54-56,66,4.