首页|期刊导航|中国电机工程学报|核电机组参与电网调峰及与抽水蓄能电站联合运行研究

核电机组参与电网调峰及与抽水蓄能电站联合运行研究OA北大核心CSCDCSTPCD

Analysis of Nuclear Power Plant Participating in Peak Load Regulation of Power Grid and Combined Operation With Pumped Storage Power Plant

中文摘要英文摘要

研究了核电机组(nuclear power plant,NPP)参与电网调峰的必要性、可行性,根据核电特点,利用核电机组模型仿真分析了核电机组调峰运行的特性及相互影响因素,提出了核电机组直接参与电网日负荷调峰的运行模式.结合抽水蓄能的运行特性,比较分析了核电与抽水蓄能机组联合的3种调峰运行模式.结果表明,核电机组具有良好的调峰能力,可按照"12-3-6-3"的出力方式参与电网日负荷调峰,但其调峰的深度和速度受到安全件及经济性的限制.将抽水蓄能机组…查看全部>>

The necessity and feasibility of nuclear power plant (NPP) participating in peak load regulation of power system were studied. By establishing NPP model, the performance characteristics of NPP and effect factors were simulated and analyzed. Then the operation mode of NPP directly participating in daily peak load regulation was proposed. Based on the operation characteristics of pumped storage power station, three combined modes of NPP and pumped storage po…查看全部>>

赵洁;刘涤尘;雷庆生;杜治;王静;周玲;黄涌

武汉大学电气工程学院,湖北省,武汉市430072武汉大学电气工程学院,湖北省,武汉市430072湖北省电力试验研究院,湖北省武汉市430077湖北省电力试验研究院,湖北省武汉市430077武汉大学电气工程学院,湖北省,武汉市430072武汉大学电气工程学院,湖北省,武汉市430072华中电网有限公司,湖北省,武汉市430077

信息技术与安全科学

核电机组调峰调峰特性抽水蓄能联合运行

《中国电机工程学报》 2011 (7)

新一代核电机组的理论及与电网相互影响的机理研究

1-6,6

国家自然科学基金项目(51077103)中央高校基本科研业务费专项基金(武汉大学20102070101O00075).