电网技术2011,Vol.35Issue(3):90-93,4.
宁东-山东±660kV直流输电工程解锁逻辑研究
Deblock Logic for ±660 kV DC Power Transmission Project From Ningdong to Shandong
杨鹏 1杨景 2王亮1
作者信息
- 1. 中国电力科学研究院,北京市,海淀区,100192
- 2. 华北电力大学,电气与电子工程学院,北京市,昌平区,102206
- 折叠
摘要
Abstract
Deblock performance of converters is an important ifidex to examine the control strategy of HVDC power transmission project. A well behaved deblock can make the starting process of DC system smoothly and mitigate the disturbance in AC system. The ±660 kV DC power transmission project from Ningdong to Shandong is the first DC power transmission project operated in ±660 kV voltage grade in the world, and the Kick Start strategy from SIMSDYN D teclnique is applied to the deblock of this ±660 kV DC transmission project. The deblock strategy is analyzed and compared with the deblock strategy MUCH2, and the deblock strategy is simulated by physical model of HVDC and tested on actual control and protection platform for the ±660 kV DC power transmission project. When the reference value of current of deblock logic is released to 0.1 pu, the phenomenon of current overregulation in the direction of zero-axi is modified to make the deblock current more smoother.关键词
高压直流输电/解锁逻辑/换流阀/闭锁Key words
HVDC power transmission/ deblock strategy/converter valve/ block分类
信息技术与安全科学引用本文复制引用
杨鹏,杨景,王亮..宁东-山东±660kV直流输电工程解锁逻辑研究[J].电网技术,2011,35(3):90-93,4.